A9.08

Performance-Based Measurement and the Secondary-Task Method

Cards in this group · 4

  1. A9.08.1Unchanged primary-task performance does not mean load hasn't increased — resources may simply have slack left
  2. A9.08.2The secondary-task method infers the primary task's remaining resources from the performance drop on an added task
  3. A9.08.3The secondary task's own presence changes how the primary task is performed — the measurement interferes with what it measures
  4. A9.08.4The secondary-task method is sensitive when the two tasks compete for the same resource, and underestimates load when they don't