L4.11

Pre-action Confirmation and Irreversible Operations

Cards in this group · 5

  1. L4.11.1Confirmation should show the concrete objects that will be affected, not just the action category
  2. L4.11.2Batch confirmation needs an inspectable list; a count is not enough to judge
  3. L4.11.3Confirmation fatigue strips high-frequency confirms of their protection; confirms must be graded by consequence
  4. L4.11.4Reversible acts are cheaper overall if post-hoc undo replaces pre-action confirm
  5. L4.11.5Outward acts should be treated as irreversible even if they can be deleted later